Bridgestone Associates performed a two phase CHP feasibility study with follow-on development and engineering work. Phase 1 of the study included a preliminary analysis of CHP plants ranging in size from 12 MW to 350 MW utilizing simple cycle, combined cycle and boiler/steam turbine configurations. Phase 2 of the study included detailed feasibility analysis of inside-the-fence generation configurations including equipment selection and preliminary engineering.